Tuesday, May 26, 2009

Still plugging away

We worked on the siding all weekend, working around the rain schedule. We only have about 1/3rd of the front of the house left to go (I will try to get pictures posted soon). The dry wallers are here and have the first coat of mud on. I am planning a painting party for the first weekend of June if anyone is interested. Trent should have all the priming done so all we have to do is the finish coat. No trim, outlets or carpet so it should be pretty easy.
Cydney left to go to her Mother's on Saturday evening. She will be gone for 5 weeks then she comes back just to leave again and go to 4-H camp. She is excited about overnight camp. I think she misses Miranda. She has called every day since she left.

Tuesday, May 5, 2009

Trent has been working hard on the addition. He had his electrical inspection last week and passed. He got the OK to go ahead and put up insultion and dry wall. We hadn't expected to do dry wall until June or so if wew were lucky but it looks like we should be ready for the dry wallers to come in another week or so. Trent got the duct work done last night and has most the insultion in upstairs. I think they are trying to organize a siding party for this weekend so the outside will show some progress. I can't wait to have it all done and move in. Hopefully by the end of the summer so we can get settled in before the baby comes. I am 18 weeks today. We go for an ultrasound in 2 weeks and we will find out the sex. I am dying to go shopping to get the nursery all outfitted.

Tuesday, April 14, 2009

Easter

Miranda in her little red wagon that she got for Christmas from Grandma LeeAnn and Grandpa Harry. With the nice weather we finally got it put together. She loved riding in it.



























Miranda on her Easter egg hunt at church






Easter Egg hunt at Grandpa's in the rain. She did a great job of picking up the eggs and puttin ghtem in the basket

















Reading in the laundry basket, which she likes to do









Wednesday, April 1, 2009

And the constuction goes on




Trent high up on the lift getting the shingles up to the roof.
After the windows and the door were installed
Izzy is getting big! Still small enough to fit through the fence though.


Friday, March 13, 2009

Update


This is the latest, taken this morning. It is really going up fast. They are ready to put up the interior walls upstairs. They delivered the tub and showers. I was so tempted to sit in the tub. It will be so nice to have a bath tub I can soak in and not be sticking half way out.




Monday, March 9, 2009

Moving along

Our addition is really coming along. You can see the walls for the first floor and the floor joists for the second floor are up. Trent spent part of the weekend removing our overhang and facia. He also moved the flooring sheeting up on top. Good thing he is strong and tall.


Friday, March 6, 2009

The Addition


We are making progress on the addition to our house. The concrete guys showed up last monday and they now have all the concrete poured. Just waiting for it all to cure. And Spady's showed up yesterday and started on the framing. We should have the rough structure up in a few more weeks. The first picture is after Trent took down the 3 big trees on the north side of the house. We'll have to do some planting of trees, flowers, grass, etc. when we are all done. I'll try to get pictures up every once in a while so we can see the progress